  1.     The funding and the timetable
  2.     Economic costs of road accidents 2005 - 2022, Germany
  3.     Possible ecological materials for the construction of the rail system

1. The financing and the timetable

A timetable and quantity structure will also be drawn up for the financing.

It is planned to build up 40,000 km of tracks incl. stops in cities in Germany within the next 10 years. (4,000 km per year)

 

a. Rough cost breakdown:

  • 1 km of rails approx. 4 million EUR
  • Maintenance 500 EUR per km per year starting from the 2nd year onwards.
  • IT costs 10 million for the first 4 years, then 7 million

b. Rough financing:

Financing starts at 10% pro rata from the 2nd year (equivalent to 4,000 km) and increases by 10% each subsequent year until 100% and the 40,000 km is reached.

 

c. Compilation

1. Proportionate costs of 50% of the accident costs from 2019
(traffic fatalities 1,500, serious injuries, minor injuries and property damage         approx. 24.0 billion EUR 

2. 70% of the motor vehicle tax is rebooked                                                                approx.   6.5 billion EUR

3. Proportionate CO2 consumption from 2017 with 70% for the cities                     approx.   8.0 billion EUR

4. 60% of the mineral oil tax                                                                                          approx. 24.0 billion EUR

5. 50% of public transport costs                                                                                    approx.   5.5 billion EUR

6. Congestion costs in cities                                                                                           approx.    5.0 billion EUR

                                                                                                                Total:                approx. 73.0 billion EUR / year

 

d. Ein Finanzierungsmodell:

 

Costs of EUR 0.10 are included per kilometre used. The billing should be done with the borderless ticket
theme IV,so that social components are taken into account.

Of course, everyone has to make their own calculation.

2. Economic costs of road accidents 2005 - 2022, Germany


3. Possible ecological materials for the construction of the rail system

New materials should be used to create the rails. The following materials are already available:
1. bridges made of recycled plastics in Great Britain
2. carbon concrete in Germany, among others,
3. new construction material is bonded with blastfurnace slag and no longer with cement. The pilot project in the Filder Tunnel as part of Stuttgart 21 was a complete success. Germany Austria.

4. The Torre de Mayor in Mexico City is an earthquake-proof building whose technology can also be used for the rails.
5. The largest wooden hotel was opened in Norway, Brumunddal, with 18 floors and 86 m height. This shows the possibilities for this rail system,
6. A 300 m high wooden building with 80 floors is planned in London. Wood as a building material is being rethought.




If you find any errors, we are grateful for any advice.