A timetable and quantity structure will also be drawn up for the financing.
It is planned to build up 40,000 km of tracks incl. stops in cities in Germany within the next 10 years. (4,000 km per year)
a. Rough cost breakdown:
b. Rough financing:
Financing starts at 10% pro rata from the 2nd year (equivalent to 4,000 km) and increases by 10% each subsequent year until 100% and the 40,000 km is reached.
c. Compilation
d. Ein Finanzierungsmodell:
Costs of EUR 0.10 are included per kilometre used. The billing should be done with the borderless ticket
New materials should be used to create the rails. The following materials are already available:
1. bridges made of recycled plastics in Great Britain
2. carbon concrete in Germany, among others,
3. new construction material is bonded with blastfurnace slag and no longer with cement. The pilot project in the Filder Tunnel as part of Stuttgart 21 was a complete success. Germany Austria.
4. The Torre de Mayor in Mexico City is an earthquake-proof building whose technology can also be used for the rails.
5. The largest wooden hotel was opened in Norway, Brumunddal, with 18 floors and 86 m height. This shows the possibilities for this rail system,
6. A 300 m high wooden building with 80 floors is planned in London. Wood as a building material is being rethought.
If you find any errors, we are grateful for any advice.